If you are gathering custom home ideas, you probably have a lot in hand or close to it, and a folder of saved photos on your phone. A feature and its deadline are the same thing.
So the useful question about anything you want is not whether you want it. It is when you have to know. If you are building in 2027, nearly all of it is still open, and the custom home features worth the most now are the ones that are nearly free this month and impossible in nine.
One of the homes we built, The Villa, was designed with no space wasted, and the family made full use of every area of it. That comes from planning, not square footage. A good custom home builder can tell you the last moment to change your mind.
Every Custom Home Idea Has a Deadline
A house gets built in one order, and every custom home idea on your list attaches to one point in it. Seven stages, in the sequence a site actually follows:
- The lot, and where the house sits on it.
- The plan, while it is still on paper, which designers call schematic design.
- The permit set, where the structure, the mechanical design and the energy model get settled.
- Framing.
- The rough-in, before the walls close.
- Finishes.
- Later, which is a much bigger category than people fear.
Some ideas are decided by the land, and nothing recovers them. Some are free to move while the plan is on paper and become structural work once the permit is in. Some live inside the walls and cost a few minutes of a trade’s time at the right moment. And some stay reversible for as long as you like, so their only deadline is the schedule.
Most of what people later wish they had done sits in that third group. It is invisible, so nobody puts it on a wish list, and it costs almost nothing on the day it is possible and a demolition job the week after. The unique home features people remember in a finished house are usually ordinary ideas somebody asked for at the right moment.
The same feature can be nearly free, expensive or impossible depending on the week you ask for it. What changes is never the feature. It is what has already been built around it.
| Feature | When It Has to Be Decided |
| Walkout or daylight lower floor | Before you buy the lot |
| Second kitchen with its own hood | Schematic design |
| Mudroom sized for a season of gear | Schematic design |
| Primary bedroom on the main floor | Schematic design |
| Curbless shower | Framing |
| Ducted air with a filter in it | Schematic design |
| Gas range or gas fireplace | Permit set, inside the energy model |
| In-floor heating | Before the slab or the subfloor |
| Covered outdoor room | Schematic design and permit set |
| Gas, water and a drain under the patio | Before the patio pour |
| Attic trusses over the garage | Permit set, before the trusses are ordered |
| A vaulted or raised ceiling | Permit set, before the trusses are ordered |
| Blocking inside the walls | Framing |
| Empty conduit and an EV circuit | Rough-in |
| Radon pipe under the slab | Before the pour |
| Appliances, tile, paint, fixtures, furniture | Finishes, and genuinely later |
Start With the Lot, Because It Settles the Most
The lot makes more decisions than any designer will, and it makes them before anyone is hired. Two of them are worth more than everything else you choose later, and the land settles both. Neither has a later version, which is why they belong in the conversation while you are still comparing lots.
A Walkout or Daylight Lower Floor, Which the Slope Decides
On a flat lot the lower level is a basement. Where the land falls across the site, the same floor gets full windows and a door out to grade, and becomes a real storey instead of storage. Where the fall runs sideways, the daylight version with tall windows on the low side is the one that works.
Who it suits: anyone shopping sloped lots, which in Greater Vancouver is most buyers, and anyone who needs a floor for a second generation, a rec room or a suite. It is decided at the lot, before a drawing exists, and it is one of the few decisions already closed for anyone who has already bought flat land. No later decision creates a slope.
The Mackenzie’s lower level holds a rink, a theatre room and a bar, which is what that floor becomes when it was planned as a floor. Once you have one, what a finished lower floor can become is the easier question.
Where the Sun Lands, and How Much House the Lot Will Hold
The rooms you use in the morning want morning light, and the rooms you use in the evening want evening light. West-facing glass is the one to limit, because it gives you little winter warmth and overheats the room in summer. Get this wrong and no amount of glazing fixes it, because the problem is which way the glass faces. Include the kitchen in the thinking: it is the room people stand in longest and the one most often pushed to the back of the plan with no window in it.
Lot coverage, height, and whether a garage or a lower floor counts toward floor area are set by your municipality, and the answers differ between them, so how much house the lot will hold is a question for before the offer rather than after it.
Trees can decide the rest. In Surrey a building permit is not issued until the tree protection barriers are installed, inspected and approved by the City, and the City recommends hiring a consulting arborist before the permit application goes in. A lot’s trees can move the house.
Kitchen and Pantry
The kitchen gets the most money and the least planning time, and almost every regret in one is a plan problem rather than a finish problem. Cabinetry, counters and appliances are late, reversible decisions. The rooms around them, and the services that reach them, are not.
A Second Kitchen for High-Heat Cooking
A second kitchen is a separate enclosed room with its own range and its own exhaust, for wok cooking, pressure cooking and heavy spice. In much of Greater Vancouver a kitchen like this is simply expected, and it suits any household that cooks that way most days, plus anyone who entertains and wants the mess behind a door.
The problem it solves is physical: in an open plan with a tall ceiling, a single hood over an island cannot catch what a wok burner produces, so the oil and the smell end up in the furniture.
It is settled at schematic design, and it is one of the strictest deadlines in the house. It needs a room with a door, a duct run to the outside that competes with joists, beams and the floor above, and often a powered supply of replacement air interlocked with the exhaust. A full second kitchen can also read to a plan checker as an unpermitted suite, so how it is drawn matters. Raise it at the first design meeting. Our Rockstar project in Langley has a kitchen and a wok kitchen as two separate rooms.
The Pantry, the Prep Sink and the Landing Space
A walk-in pantry only works if it has a counter, power and a door. Shelves relocate the boxes. A counter with outlets relocates the stand mixer, the air fryer and the coffee grinder, and the main kitchen stays clear. The door is what makes it work on a day nobody has tidied. Buyer surveys keep putting a walk-in pantry at the top of the kitchen list. It is decided at schematic design, because a pantry is a room and its floor area comes out of the kitchen, the mudroom or the garage next to it. The Ilo has a hidden walk-in pantry with its own fridge and sink.
A second sink comes next, for two people cooking at once or for the day the dishwasher door blocks the only sink. Decide it on the drawing, because it changes the island and the drain has to route through the floor below, which is not always available later.
Landing space is free on a drawing and a rebuild after the cabinets are in: a counter beside the wall oven for a hot tray, clearance so the fridge door opens fully, a counter beside the cooktop for the plate. A professional-style hood moves enough air that the house has to be given a way to replace it, and that supply is part of the mechanical design rather than an accessory bought with the range, so choose the hood while the mechanical drawings are open.
The Entry, the Mudroom and the Laundry
The door everyone actually uses is usually not the front door, and in a wet climate that door decides how the whole house stays clean. Both decisions cost nothing on paper, and quite a lot once the plan is set and the walls are where they are going to be.
A Mudroom That Is a Room, Not a Widened Hallway
A mudroom is a room at the door people use, with a bench and somewhere per person to put boots, coats and bags. It suits any household with children, dogs, bikes or sports gear, and in Greater Vancouver any household at all between October and March.
The honest failure mode is not the missing mudroom. It is the undersized one: too small to hold a season of outdoor clothing, so it overflows into the kitchen anyway, and homeowners who have lived with a small one will tell you it just becomes a dumping ground. It is settled at schematic design, and it is the clearest case in the house of a feature whose real constraint is what it displaces, because it competes with the garage, the pantry and the powder room for the same corner of the plan. A mudroom is on The Rockstar, The Royal, The Wolfe, The Park, The Mackenzie and The Villa.
Add a rinse station. A raised tiled basin with a hand shower, for dogs, boots and gear, stops the dirt at the door. The drain is the irreversible part, so rough it in even if the basin comes later.
Laundry Where the Clothes Are, and Out of the Dirt Path
Put the laundry on the floor where the laundry is generated, and make sure the route from the dirty door does not cross the folding surface. That suits families carrying baskets down two flights, and anyone combining the laundry with the mudroom, which is most people. Combining them works right up to the day there is clean folded laundry on the only surface and someone comes in through it in wet boots. The fix is door placement, not two rooms.
Schematic design settles the room and the structural question of putting a washer on a framed floor above living space. Rough-in settles the drain, the dryer vent and the dedicated circuits. The detail people miss is an exterior wall, so the room gets a window and the dryer vents straight outside. A laundry room is tied for the most wanted feature in a large North American buyer survey, at 86 percent. The Rockstar has two laundry rooms, which is the version that solves it on a big house.
The Primary Suite
The suite is where the plan and the next 30 years meet. One of these decisions cannot be undone at all, and the other three are nearly free and almost always deleted when the plan gets tight. That is backwards, because the free ones are the ones you notice every day.
The Primary Bedroom on the Main Floor
A primary bedroom with a full bathroom on the ground floor means the house still works on one level. It suits anyone who intends to stay for decades, anyone already thinking about a knee or a hip, and couples whose children have left or will. Architects report it as one of the fastest-growing requests they get, and as a mainstream ask rather than a seniors’ one. Stairs are the feature that most often forces people out of a house they would otherwise keep.
It is a schematic design decision and close to irreversible. It reorganizes the main floor, changes the structure above it and usually changes the footprint of the house. There is no later version of this decision, which is why it belongs in the first conversation about the plan rather than the fifth.
A Curbless Shower, a Private Toilet Compartment and a Linen Closet in the Room
Three decisions in this room are nearly free on a drawing and expensive or impossible afterwards.
The curbless shower is the purest example of a feature that is nearly free at the right moment and a major renovation one week later. The floor has to be dropped or the joists modified so that the drain and the slope fit below the finished floor, which makes it a framing decision. It reads as a design choice and it functions as the thing that keeps a bathroom usable years after a curb would have stopped it.
A private toilet compartment is the cheapest privacy in the house, one partition and one door, but the room has to be dimensioned for it on the drawing. And a linen closet inside the bathroom, rather than two doors down the hall, is trivial on paper and impossible later without losing a wall. It is also the first thing deleted when the plan tightens. All three sit high on what buyers say they want in a bathroom, and all three are decided before anyone picks a tile.
Comfort, Energy and Air
Heating, cooling and clean air used to be three separate conversations in this region. A new house has to do all three, so they are one conversation now. In-floor heating carries the hardest deadline: tubing in a slab goes in before the pour, and the floor finish has to be chosen before the system is sized. We have built it on The Ilo, The Wolfe and The Mackenzie.
One Cool Room, and the Shading and Glazing That Support It
The 2024 BC Building Code adopted a cooling requirement for one living space that does not exceed 26 degrees Celsius, for projects whose permits were applied for after March 2024. During the heat event of late June 2021, British Columbia recorded hundreds of heat-related deaths, and most of them happened indoors.
So the question is no longer whether but how. That applies to everyone building here: a house designed in 2005 assumed cooling was optional. The real decision is which strategy, because only the passive route changes the drawing. Passive means schematic design, which room it is, which way it faces and what shades it. Mechanical means rough-in.
Two things do most of that work: deep roof overhangs, which keep wind-driven rain off the walls and shade high summer sun while letting low winter sun in, and glazing concentrated where the exposure is worst rather than spread evenly, which decides which rooms get sun and which get heat. Where the windows go is settled on the drawings, and the openings are framing at the latest. We have used triple-pane windows on The Royal, The Ilo and The Park.
A better-performing wall is also a thicker wall, and that thickness shows up in deep window sills, in trim depth and a little in the room inside, so what a high-performance wall assembly involves belongs on the drawings before the elevations are settled.
The Mechanical Plan: Filtered Air, Fresh Air and Where the Gas Decision Gets Made
Ducted or ductless comes first, and it is a schematic design decision. A ductless system cools beautifully and has nowhere to put a filter. A ducted system has a filter slot, so the equipment that cools the house can also clean it, and running the fan through a smoke event pushes the indoor air through a filter rated for fine smoke particles. Ducts also need chases, soffits and mechanical space, which come out of the floor plan and the ceiling heights.
Fresh air needs runs of its own. A new house here will be airtight enough to need mechanical ventilation whether or not anyone discussed it, and the mistake is pushing that air through the heating ducts instead of giving it dedicated runs to the bedrooms and living rooms, with exhaust from the bathrooms and the kitchen. Those runs need room in the plan, and no finished house takes them well.
Then gas. A gas range, a gas fireplace or a gas dryer is not ruled out. It is now part of how the home’s emissions get modelled, so whether yours can be included is settled with the energy advisor while the plan is on paper rather than chosen at the appliance showroom.
The envelope, the windows and the heating equipment all lock at the permit set, and changing one of those specs afterwards means the model has to be re-run, which is why how the Energy Step Code works on a custom home build is worth reading before you choose any of them.
Wellness and the Rooms That Need Quiet
A sauna, a gym and a media room get sold as luxury home features, and they are the rooms most often built wrong, because the room gets a label on the plan and not the four things behind its wall. The label is free. The four things are not.
A Sauna and a Gym: The Services Go In Before the Walls Close
A sauna is a real feature for a household that will use it weekly and furniture for one that will not. The test is whether the habit already exists. Behind the wall it needs a dedicated circuit for the heater, a floor and walls that tolerate heat and moisture, ventilation, and ideally a drain and a cold shower beside it. The cabin itself can go in at finishes; those four services cannot, so the decision is to reserve the room, the circuit and the drain. The Royal has a cedar sauna room.
A gym fails differently. A room labelled gym is often unusable for what the owner had in mind, because the ceiling is too low for anything overhead and the floor was never meant for dropped weight. It is also a noise room, and under a bedroom that is a problem nobody anticipated. Schematic design sets the ceiling height and the position relative to the bedrooms, framing sets the floor and any sound separation, and rough-in covers ventilation and mirror blocking. High enough that nothing you do overhead hits the ceiling is the brief, and in a basement that height comes from the excavation, which comes from the lot. We have built a gym on project after project.
The Media Room and the Home Office
A media room’s size, its shape and its distance from the bedrooms are schematic design decisions, and the wiring, the speaker backing and the conduit are rough-in. That is the part a plan has to carry. Everything else about planning a media room, from the seating to the screen, is a longer subject on its own.
The gap worth filling on the office is two of them rather than one, now that both adults may work from home, plus a real door with a wall that stops a call. Sound separation is insulation in the cavity, a second layer of drywall, a solid-core door and attention to duct routing, because a shared duct carries sound straight between two rooms no matter how good the wall is. The door is the one part that can be upgraded later. Schematic design settles the second office and where both sit relative to the noisy rooms, and framing and rough-in settle the separation. The Ilo has two offices, and designing a home office that works is mostly about what goes in the room once the plan has made it quiet.
Outdoor Living in a Rain Climate
The outdoor space most people plan is the one they would use in California. Here is the local version: an uncovered deck gets used for a few months a year, and a covered one gets used for most of them. That one difference reorganizes the back of the house.
A Covered Outdoor Room, Not an Uncovered Deck
A covered outdoor room is part of the outdoor space with a roof over it, a light and a heater, so it is a room rather than a surface. It suits every household in Greater Vancouver. The difference is not comfort, it is whether the space gets used at all, and an unused outdoor space is the most expensive floor area on the property.
It is settled at schematic design, and often at the permit set and at the lot too, because a roof is structure, it frequently counts toward lot coverage and it has to respect the setbacks. A deck can be added to almost any house. A covered outdoor room, with a continuous roof line, recessed lights and ceiling-mounted heaters, is part of the house. Architects name outdoor living among the rooms clients most often ask to add, and once the roof is on the drawings, ideas for elevating your outdoor living space are what fills it.
Gas, Water and a Drain Under the Patio Before the Pour
This is capped and labelled sleeves through and under the slab, for gas, water, power and drainage, put in with the vapour barrier before the concrete goes down. It suits anyone who will ever want an outdoor kitchen, an outdoor shower, a hot tub or even a barbecue in a fixed position. The drain is the critical one, because it needs continuous fall back to the connection, and that route either exists or it does not.
The stage is rough-in, specifically before the pour, and there is no later version that does not involve a saw. The same morning covers the hot tub: a pad rated for the filled weight, a dedicated circuit and somewhere for the water to go when it is drained are all incremental if they happen with the patio, and three separate jobs if they do not. Cold-only on an exterior wall is a simple outdoor shower, and hot and cold with a trapped drain is a rough-in decision. The Ilo and The Royal both have outdoor kitchens, and The Ilo has an outdoor shower.
Storage, Designed as Deliberately as the Kitchen
Storage never makes a list of must have features in a new home, and it is what people most often say they got wrong. Storage is a location problem, not a quantity problem.
Closets get drawn where the plan leaves gaps instead of where things are used and put down. A coat closet at the door nobody uses is not storage, and a linen closet in the bathroom beats a bigger one down the hall. Under-stair volume is free and usually wasted. Two smaller closets in the primary suite, or one closet plus a dressing area, solve the problem one shared walk-in creates without more floor area.
Buyer surveys on both sides of the border keep putting storage near the top of what people want. Locations are schematic design and they do not move. The interiors are finishes and can wait.
A Garage With Depth, and a Door for the Bikes
Specify the garage by what it has to hold rather than by bay count, and give the gear a closet with its own door to the outside. Depth is the thing that fails. Two cars fit. Two cars plus a workbench, shelving, bins and a bike do not, and a full-size pickup does not fit the plan’s default. Deep enough that the car doors open and the shelving still fits is the brief to give your designer.
The gear door matters because bikes, paddles and skis otherwise either block a car or come through the living space shedding grit. This suits anyone with a truck, tools or equipment, which is most households here. It is a schematic design decision constrained by the lot, because garage depth competes directly with the rear yard and the setbacks, so here the constraint is the land rather than the plan. Garage storage sits among the highest-rated features in that same buyer survey, at 81 percent.
Attic Trusses Over the Garage, and the Ceiling You Draw
Attic trusses are engineered with an open centre, so the volume above the garage becomes a floored room or a tall storage space instead of dead air. It suits anyone with seasonal belongings, and anyone who might want a studio, a guest room or a teenager’s space later.
The stage is the permit set, because the trusses are engineered and ordered from the drawings and the fabrication lead time sits in front of them, which puts the real deadline earlier than framing. A bonus room over an unconditioned garage does need a real plan for insulation and heat, or nobody uses it in January, and that plan is part of the same drawing set. You cannot convert standard trusses to attic trusses afterwards without effectively re-roofing. The same deadline governs ceiling volume anywhere in the house: a vaulted or raised ceiling is framed from the drawings, so the height of a great room is settled on paper and not on site.
The Decisions That Live Inside the Walls
These are the decisions that matter most and get asked about least, because none of them can be photographed. Everything here is a few dollars of material and a few minutes of a trade’s time at one moment, and demolition afterwards. Nobody asks for any of it, which is exactly why it is worth asking about.
Before the Insulation Inspection: Blocking, Wiring and the Pipe Under the Slab
There is a literal, inspected point in a BC build after which the walls close. In Surrey, for example, a house has to have an air leakage test done before it can proceed to the insulation inspection, which in practice means the electrical and mechanical rough-in is finished and inspected first. Everything that lives inside a wall has to be in by then, and the electrical rough-in happens before the insulation goes in for exactly that reason. We record a full video of the wiring in the walls before the insulation goes in, so a concealed run can be found again years later.
Blocking comes first. Drywall anchors do not hold a grab bar, a wall-mounted television, a heavy mirror, a floating vanity, a towel bar that gets pulled on or a wall-hung cabinet. Solid blocking between the studs does. It costs a few pieces of lumber and 10 minutes of a framer’s time, and it does not show. The decision is not whether to install a grab bar but whether installing one in 15 years is an afternoon or a drywall repair, so put solid blocking in the bathroom walls where grab bars would go. British Columbia has brought in adaptable-design rules for several kinds of new homes, and a designer will say whether yours is one of them. Either way the reinforcement costs nothing while the wall is open.
Then the radon pipe. The rough-in under the floor slab is a layer of clean gravel, a pipe and a penetration, installed while the slab is still being formed, with the fan added only if a test later shows it is needed. It cannot be added once the concrete is down, and what your city wants to see is settled on the permit drawings rather than on site. Testing across the country has found higher readings in BC’s interior than in the Lower Mainland, and the rough-in is worth having anyway, because it turns a future fan into a plug-in rather than a project.
Outlets, Lighting and Empty Conduit
Outlets get placed to satisfy the spacing rule rather than to serve the furniture, so there is none beside the sofa, none in the island, none where the tree goes in December and none in the floor where a lamp belongs. The ones people wish they had are specific. They want a pair on each side of the bed with a switch on each side, outlets inside cabinets and in the back of a drawer so the toaster and four phones stop living on the counter, and floor outlets under furniture. Outside, they want outlets on more than one wall and on an interior switch so the holiday lights go on from inside, plus hose bibs on more than one side of the house.
Lighting gets decided by whoever is holding the drawing when the electrician asks, which produces a grid of downlights on one switch. The failure is specific: if the downlights and the accent lights share a switch, you can never have one without the other. Fixture locations, switch legs and dimming zones are fixed months before anyone chooses a fixture.
Empty conduit costs the least and buys the most. A conduit with a pull string, from the roof or the meter to the electrical room and from the mechanical room to the attic, turns a future renovation into a future installation. The same logic covers the car charger: plan the panel and the conduit for two, because the second car is the one that gets forgotten. Charging requirements for a new home are set by the municipality, so what applies to your lot is confirmed with your city before the electrical plan is drawn.
Backup power works the same way. A sub-panel of essential circuits and conduit to a generator pad now means a generator becomes a connection rather than a project, and a generator wired into a house needs an approved transfer switch, a permit and an inspection, while a portable one must never be plugged into a household outlet.
All three depend on one decision most people have not made yet: where the furniture goes. That gets settled before the electrician arrives, which is earlier than almost anyone expects. The devices are a late and replaceable decision and the capacity behind them is not, which is the part making the most of smart technology in a new build depends on entirely.
Future-Proofing Without Guessing
Future-proofing is not predicting what you will want. It is leaving capacity so the answer stays cheap. The dream home features that matter at this stage are the ones that keep this house the right one in 20 years without you having to guess which room changes first.
Wider Doors, and a Closet That Could Become a Lift
A standard door is too narrow for a wheelchair or a walker, and often for a sofa. Widening one in a finished house means headers, drywall, trim and flooring. Chosen at design, wider openings cost almost nothing and read as generous rather than medical, which is the argument that actually persuades people. Hall widths are schematic design. The openings are framing.
The bigger idea is stacked closets. Two or three closets stacked in the same footprint, framed to the right opening with a knock-out floor panel and a capped circuit nearby, mean the shaft for a lift already exists. Until the day it is needed, they are closets. Nothing requires a house to have an elevator, and adding one to a finished three-storey house is a structural project. This only works if it is on the plan before the floors are framed, because it constrains two floor plans at once.
A Flex Room, and a Second Home the Lot Could Take Later
A room labelled office is one room. A room with a window, a closet, a door, a decent outlet count and no built-in desk is four rooms over 20 years: playroom, homework space, guest room, bedroom. The unglamorous parts are what make it flexible, and the closet quietly decides whether it can ever be a bedroom. The window, the closet and the position are schematic design; the power and the data are rough-in. Architects report that the rooms clients most want added are the ones that can be more than one thing.
The bigger version is a second home on the lot. A suite converted later is a compromise. A suite designed in has its own entrance in the right place, real separation of structure and sound, independent heating and ventilation, and parking that works, in a main house that does not feel like a floor was removed. BC’s rules now assume more than one household on many lots, so the question is no longer whether it is allowed but what the lot supports. How big a suite you can build is set by your municipality’s zoning, which differs from city to city. Settle it before the floor plan is final, because a suite changes the stairs, the entrance and the parking, and planning a home for more than one generation starts with the household rather than the lot.
Where to Start If You Have a Lot and No Drawings Yet
The single most useful question to ask a builder about any feature is this: what is the last moment I can change my mind about this? The answer is different for every item, and someone who asks it at the first design meeting ends up with a different house than someone who asks it during framing.
Getting those decisions onto drawings is what custom home design is for, and it is the stage where nearly all of them are still cheap. From there, Versa Homes works to a detailed build schedule with the trades pre-booked, so the framing and rough-in deadlines land on real dates instead of a vague someday. Our client portal carries daily logs and progress photos, so you can look at the walls before they close. And we build to a fixed-price contract, which means the plan is settled before the build rather than during it. If you have a lot and no drawings yet, get in touch with our team and bring the photos.
Frequently Asked Questions
A handful of questions come up at almost every first design meeting, and the answers are shorter than people expect.
What Should I Decide First When Building a Custom Home?
The lot and where the house sits on it, then the plan, then the permit set. Those three settle the slope, the orientation, the room layout, the structure and the mechanical design, and each one closes a door behind it. Finishes come last and stay changeable, which is the opposite of the order most people work in. The decisions you will enjoy are the reversible ones.
What Are the Most Popular Must-Have Features in a New Home Right Now?
A laundry room and a patio lead a large North American buyer survey at 86 percent each, with garage storage at 81 percent and a full bathroom on the main level at 80 percent. What those new home must haves share matters more than the ranking: every one of them is a plan decision rather than a finish, and none can be added later without moving a wall, a roof or a drain.
Which Custom Home Features Are Hardest to Add Later?
Blocking in the walls, empty conduit, sleeves under a slab, the radon pipe, a curbless shower and attic trusses, plus anything that depends on where the house sits on the lot. All of them are invisible in a finished house, all of them cost very little at one moment, and all of them mean opening concrete or drywall afterwards. The slope is the only one with no later version at all.
Do I Have to Have Air Conditioning in a New BC Home?
You have to have a living space that does not exceed 26 degrees Celsius, which the 2024 Code requires, so a new home here is designed for heat one way or another. The choice is passive, mechanical or both. Passive means orientation, glazing and shading, which are drawing decisions. Mechanical means equipment and ducts. Either way it is settled early, not during the build.
Can I Still Have a Gas Range or a Gas Fireplace in a New Custom Home?
Gas appliances are not ruled out. Whether yours can be included is decided inside the energy model with the energy advisor, while the plan is still on paper rather than at the showroom. That is why the conversation belongs at design stage: the appliance is part of the house’s modelled performance, so picking it after the permit set means the model gets re-run before the spec can change.
Which Decisions Can I Safely Leave Until Later?
Tile, paint, plumbing fixtures, cabinet hardware, appliances, blinds, furniture, the sauna cabin itself and the charger that plugs into a circuit already in the wall. Their only constraint is the schedule, not the drawings, so you can change your mind about all of them long after the house has a shape. That is most of the fun part, and it is genuinely safe to defer.
Felipe Freig
Founder of Versa Homes
Felipe Freig is the founder of Versa Homes, a Vancouver custom home builder known for architecturally driven, fixed-price projects. With years of hands-on site experience and deep permitting and by-law knowledge, Felipe leads high-performance teams that deliver precision craftsmanship, clear budgets, and on-schedule luxury homes.
You May Also Like...
Top 3 Rated Shower Membrane Kits for Your Custom Shower
Top Home Security Gadgets: Enhancing Safety in 2024
Green Living with Versa Homes: Integrating Sustainable Practices into Your Custom Home Design
Smart Home Security Wiring in a Custom Home: Plan It During Construction, Not After
Nurturing Your Custom Home: 5 Things to Keep in Mind After Construction
Safe Rooms and Panic Rooms: Design Considerations for Custom Homes
Creating an Extraordinary Custom Home Theater: Key Considerations for Your Media Room
Wildland-Urban Interface (WUI): Design Basics For Edge-Of-City Lots