How Long Does it Take to Build a Custom Home?

Freig Dusk

Building a custom home can be an exciting and rewarding experience, but it’s important to understand the timeline involved. Depending on the complexity of the project, building a custom home can span anywhere from 8 months to 2 years. If it’s a large, customized estate, the construction period is likely to be lengthier. Below is a breakdown of the customary timeline for constructing a custom home, emphasizing the significance of an easily accessible schedule that allows builders to interact with clients and trades, ensuring a seamless timeline. Here’s a concise overview.

team construction engineers working at constructio 2022 10 27 21 08 11 utc
How Long Does it Take to Build a Custom Home? 6

Design Phase (3-6 months)

The design phase is a crucial part of building a custom home, as it sets the foundation for the entire project. It’s important to take the time to carefully consider your needs and wants for your new home, and work closely with your architect or designer to ensure that the plans match your vision. During this phase, you will work with your architect or designer to create a floor plan that meets your specific requirements. You’ll discuss details like the number and size of bedrooms, the layout of the living spaces, the style and materials of the exterior, and any unique features you want to include. Your designer will likely create several drafts of the plans for you to review and provide feedback on.

It’s important to note that the design phase can take longer than anticipated, especially if you have a specific vision in mind or want to include intricate details in the designs of your custom home. To ensure that the design phase stays on track, it’s essential to have open and clear communication with your designer, and to make decisions in a timely manner. In addition, your builder should also be involved in the design phase to ensure that the plans are realistic and feasible. They can provide valuable insights into the construction process, such as the cost and availability of materials, and suggest alternative designs or materials that may be more cost-effective for your custom home.

Versa Permits 9
How Long Does it Take to Build a Custom Home? 7

Permitting Phase (3-9 months)

Before construction can begin, you’ll need to obtain the necessary permits from your local City. This can take anywhere from a few weeks to several months, depending on the jurisdiction and the complexity of your custom home project. For example, if you’re building in an area with strict building codes, the permitting process may take longer due to additional review processes. During the permitting phase, your builder will work with the city or county to secure the necessary approvals and permits for your project. This involves submitting detailed plans, engineering reports, and other documentation to demonstrate that your project meets all requirements. Your builder should have experience in navigating the permit application process and be familiar with the local building codes and regulations.

It’s important to note that permit timelines can be unpredictable, and delays can occur for various reasons. These can include a high volume of permit applications, changes to regulations, or unforeseen issues with the project design. However, permit timelines are always updated by the city, a quick call by the builder will help you understand wait times.

In addition to obtaining building permits, your builder may also need to secure other approvals, such as zoning permits, environmental permits, and utility permits. These additional approvals can add to the overall timeline and cost of the project. It’s important to work with an experienced builder who can help you navigate the entire permit and approval process efficiently and effectively.

construction
How Long Does it Take to Build a Custom Home? 8

Pre-Construction Phase (1-2 months)

The pre-construction phase is where your builder prepares the site for construction. Your builder will conduct a thorough site analysis to determine the feasibility of your custom home project. This includes evaluating the site for any potential challenges or issues that may arise during construction, such as grading or drainage issues, soil quality, and environmental concerns.

If there is an existing home on the property, your builder will need to inspect it for hazardous materials such as lead, asbestos, or mold. If any hazardous materials are present, they will need to be removed safely and legally by a certified abatement contractor before construction can begin on your custom home.

In addition, your builder may need to secure various utility connections and permits before starting construction. This includes obtaining permits for water and sewer connections, electricity, and gas lines. Your builder should have a thorough understanding of local building codes and regulations to ensure that all necessary permits and approvals are obtained before construction begins.

If there’s an old home that needs to be taken down, your builder will need to coordinate with the appropriate contractors and ensure that the demolition is carried out safely and efficiently. Depending on the size and complexity of the project, this phase can take several weeks to several months.

3. construction
How Long Does it Take to Build a Custom Home? 9

Construction Phase (8-24 months)

The construction phase is where the actual building of the custom home takes place. This phase can take anywhere from eight months to over a year, depending on the size and complexity of the project. During the construction phase, your builder will need to manage various aspects of the project, including coordinating with subcontractors, managing the construction schedule, and overseeing quality control to ensure that the work meets the high standards you expect for your custom home. Your builder should also be prepared to handle any unforeseen challenges that may arise during construction, such as weather delays, site issues, or unforeseen design changes.

It’s important to note that the construction timeline can be affected by many factors, including the size and complexity of the project, weather conditions, material availability, and any unexpected issues that may arise during construction. That’s why it’s important to have an experienced and knowledgeable builder who can anticipate potential issues and work proactively to keep the project on track.

Throughout the construction phase, your builder should also provide regular updates on the progress of the project and keep you informed about any changes or updates that may affect the timeline or budget. This communication is key to ensuring that your custom home is built to your exact specifications and that the final product meets your expectations. In addition, during the construction phase, you may also have the opportunity to make some design changes or additions to the project. Your builder should be prepared to work with you to make any necessary adjustments to the plans while still keeping the project on track and within budget.

smart house
How Long Does it Take to Build a Custom Home? 10

Final Touches Phase (1-2 months)

The final touches phase is the stage where your dream custom home finally starts to take shape. It’s when the finishing details and elements are installed and the home becomes move-in ready. During this phase, your builder will work on the final inspection of the home to ensure that everything is up to code and meets the necessary building standards. Your builder will also do a final walkthrough with you to ensure that everything has been completed to your satisfaction.

This is the time when all the hard work and dedication that went into designing and building your custom home finally pays off. Your home will become a reflection of your style and personality, with features and finishes that make it unique and special to you. Some of the final touches that your builder will add to your home might include:

    • Installation of light fixtures
    • Plumbing and electrical fixtures
    • Flooring installation
    • Paint and wallpaper
    • Landscaping and outdoor amenities

The scope of work for the final touches phase will vary based on the complexity and size of the project. For instance, if your home has many custom features, the installation of these unique elements may take longer than a standard project. In contrast, if your home is relatively simple and straightforward, this phase may be quicker.

It’s important to communicate with your builder throughout the final touches phase to make sure that everything is being done to your satisfaction. You can expect your builder to keep you updated on the progress of the work and address any issues that arise along the way. Once the final touches phase is complete, you’ll be able to move into your brand new custom home and enjoy all the hard work and effort that went into creating it.


Building a custom home can be a long and complex process, but with the right builder, it can also be a smooth and enjoyable one. It’s important to choose a builder with an accessible schedule that’s interactive with clients and trades to ensure that the project stays on track and is completed in a timely manner. With careful planning and communication, you can build the custom home of your dreams.